Project Early Warning System in 10 questions

6 min.

Summary

In project portfolio environments or even for project directors themselves, it is often not easy to get clear signals from the projects. This is to check whether they are on the right track. Often quite extensive and complex project portfolio control systems are used to determine exactly this. Practice shows that due to the heterogeneity of the projects (very large vs. very small, in country X or country Y, in business area A or B) these are not available the same number of reliable measurement points for the most diverse projects. This report shows how 10 identical simple questions provide reliable early warnings for a wide range of project sizes and types.

Why do I need a simple project early warning system?

I have already described another early warning here, which has completely different measured variables. Depending on the usage, one these approaches should be applied. In a company with highly standardized methods, processes and tools in project management, the next logical step on the way to even more quality for projects is to check the compliance of these specifications. The project management handbook describes processes, provides templates and tools to handle all types and sizes of projects in a standardized way. Even the specific usage of standard applications such as MS Project is often described and specified in detail. Compliance criteria therefore arise in the areas of policies, processes, templates and tools.

Because efficient and above all uniform methods are often lacking, which could quickly identify core problems of projects (and can quickly avert them), senior management – despite high standardization in project management – is often surprised by projects which

  • are behind schedule,
  • overrun the budget
  • and do not achieve the agreed scope

which in turn leads to

  • Customer dissatisfaction and
  • not achieving the business goals

An early warning system (EWS) contains questions on the project status, which are to be answered monthly by the project managers in the form of a questionnaire.

Objectives of the early warning system

The objective of the Early Warning System is to develop and/or integrate a set of tools and processes that quickly identify potential project problem areas and provide a meaningful tool for escalation and problem resolution as long as they are still available in a simple form to avoid surprises.

The detail goals can be:

  • Introduction of a simple, scalable system that is easy to maintain through state of the art technology.
  • Introduction of a system that enables problems in projects to be identified and eliminated in the quotation phase, start up phase and run & maintain phase.
  • Introduction of processes and tools that cannot be bypassed and ignored; to confirm compliance to processes and tools.
  • Use the EWS results to extend existing reports with the EWS information.
  • Ensure tight time-boxing from problem identification to resolution.
  • Develop a management communication plan to continuously inform senior management about the consistent implementation and enforcement of EWS tools, processes and reporting across the organization.

The success factors of the early warning system

In order to ensure a global early warning system, the following success factors must be observed:

  • Timely and accurate evaluation of program/project status related to key indicators.
  • Line management with profit & loss responsibility for programs and projects is responsible for responding to negative responses and tracking actions until completed.
  • The questions must be examined intensively by senior management.
  • The questions must be used globally unchanged in all possibly existing regional systems.
  • Program and project managers answer these questions monthly for each project.
  • Standard reports are made available to program/project sponsors to support action tracking.

Objectives of the early warning system

The following questions represent a selection for an early warning system. When adapting for specific organisations, the relative deviations are also adapted in the form of numerical values. The so-called risk response indicates the response option, which leads to a forced commenting of the entry and serves as an “alarm signal” in a consolidated evaluation.

#QuestionRisk Response
1Did the last customer survey score more than 3.5 points (out of 5)?
No
2Is the project plan updated and recalculated weekly with work done and remaining work?
No
3Are all approved change requests mapped in the project plan?
Yes
4Does the staffing run according to the planning in the project plan?Yes
5Has joint project governance been adopted?Yes
6Has a steering committee been held in the last 30 days?
No
7Is the Schedule Variance > 10%?
Yes
8Is the cost variance > 10%?
Yes
9Has the project done any work outside the approved project defined scope? Yes
10Have all deliverables performed so far been accepted?No

In a database system, the questions in the “Answer” field must be answered with “Yes/No”.

If a question is answered positively, then this question is finally answered.

If the answer to a question is negative, the project managers are asked to enter measures to solve the negative situation.

  • “Action” field: Enter measure to solve the negative situation
  • “Responsible” field: Select the name of the person responsible for the action.
  • “Planned date” field: Enter the date by which the task is to be completed (planned date).
  • “Status” field: Select the status of the action.

The results are ideally presented in a company-wide web-based EWS tool to create central reports and evaluations.

The link with a project management handbook questionnaire

If (worldwide) uniform guidelines, processes, tools and templates are available in the project management area, an extension of the questionnaire should be considered.

A detailed survey should be carried out initially at the start of the project and in the case of significant project changes by means of a detailed self-assessment questionnaire, which clearly goes beyond the following possible questions on the EWS supplement.

#QuestionRisk Response
1Was the project definition template from the project management handbook used?No
2Has the estimation procedure and the estimation templates been used according to the project management handbook?No
3Is there a weekly Earned Value calculation based on the current project plan?No
4Are problems, risks, acceptances, change requests continuously recorded in the template from the project management handbook?No

Personal observations on the EWS

I was able to observe the following findings during the supervision of project managers on the subject of EWS and the evaluations:

  • Despite very precise and unambiguous questions, additional explanations (ideally in the form of a manual) to the project managers and, in the other direction, comments on specific issues by the project managers are often required. Uniform guidelines by the central authority for specific non-standardized cases are to be ensured. This ensures the quality of the early warning system in these cases as well.
  • The project management handbook supplementary questions confirmed that only project and program managers who had already been trained could provide meaningful answers. It is better to not ask as a mandatory question in order to not dilute the quality of the statements.

When analysing the adaptation of a comparable system in an organisation, the following basic considerations arise:

  • The first questions can be transferred almost completely to other companies.
  • Such a supplementary (parallel) reporting can only be enforced by global guidelines. Regional or even departmental initiatives would experience too much resistance.
  • An automatic notification and reminder for the creation of the EWS report must be provided.
  • A monthly frequency may prove to be too low for companies with smaller projects on average.
  • An automatic analysis of the results is required, taking into account the additional manual comments. An analysis without consideration of the additional comments results in a wrong picture of the overall evaluation.
  • As with all other reporting, it should also be noted here that an early warning system can also be excluded for particularly confidential projects / customer environments.
  • The reports must be mapped IT-technically in such a way that they (almost) cannot be circumvented and ignored; in order to confirm the compliance to processes and tools. These should, for example, be linked to the filing of the official status report.
  • The EWS results should be integrated into existing reports in order to inform the classic addressees of the project status report about the additional status of the early warning system. This ensures that this group of recipients also carries out a direct or indirect quality assurance of the information.
  • The results of the early warning system should be regularly compared with complete project or programme audits in order to validate and continuously improve the meaningfulness.
  • In a project, the early warning system must not be triggered initially by the first filing of a project status report, but by the creation of project numbers or project codes, for example.
  • The early warning system should be introduced in stages. First, only projects with high project volumes or complexity should be included in the scope (it is important to apply hard criteria). This also allows the analysts to better manage the project manager’s support efforts.

Handover of a Program in 6 Phases

2 min.

If you are leaving a program, you should consider a few things when preparing and handing over the program. Here, a 6-phase approach has proven to be the best for me, which I use again and again.

1. Preparation (as early as possible!)

  • Align with stakeholders
  • Outline Knowledge-Transfer-Plan
  • Agree budget for knowledge transfer period
  • Search for successor and receive okay on specific person from stakeholders
  • Confirm final start date of successor (adapt timeline of knowledge transfer plan)

2. On-boarding (-3 weeks)

  • Successor starts on project as additional source
  • Project assignment to be defined
  • Onboard successor following all regular administration activities as access rights, calendar invites, handover process documentation etc.
  • Introduce successor in newsletter
  • Shadowing (-2 weeks)

3. Shadowing (-2 weeks)

  • Successor is your current stand in if anyhow possible
  • Successor attends all of your meetings too
  • Successor is watching all of your core activities
  • Successor updates and amends joint knowledge transfer plan and ticks off activities

4. Re-Shadowing (-1 week)

  • Show less presence, only attend team meetings but no customer meetings
  • Be there for any help for your successor
  • Be prepared to take over some operational activities
  • Send all still incoming requests / questions to your successor

5. Backup (starts with day of handover)

  • Show less presence, only attend team meetings but no customer meetings
  • Be there for any help for your successor
  • Be prepared to take over some operational activities
  • Send all still incoming requests / questions to your successor

6. Phase Out (+1 week)

  • Process all off-boarding activities for yourself
  • Release Project Assignment
  • Be there to help your successor
  • Do not take any operation tasks anymore
  • Give a farewell party and say good bye in the newsletter.
  • Send all still incoming requests / questions to your successor
  • Leave! (+2 weeks)

Success factors for a proper handover

  • Involve customer and all stakeholder in an early stage.
  • Do not arrange processes program / stream person centric but process / accountable centric.
    • Do not be single point of contact for multiple processes yourself,
    • Instead make each of your team member accountable for one or more processes from the beginning of the engagement (Management by Objective).
  • Plan and prepare your leave as an own project itself.
  • Prepare a knowledge transfer plan which must be agreed by all stakeholders.
    • Break down knowledge transfer in granular activities (1-3 hours).
    • Ask your successor to maintain this plan and tick each closed activity off.
    • Handle this plan and update it like any other project plan.
  • Communicate your leave to whole team latest at beginning of knowledge transfer period.
  • Foresee a backup period after successful knowledge transfer of up to two weeks.
  • Define a clear handover date in knowledge transfer plan.

Have fun in your new project / program!

Agile vortex?!

3 min.

Summary

Agile work or delivery is only possible if necessary decisions can always be called up. It also does not work without appropriate governance. There is huge similarity in turnaround situations of classical projects with the approach of agile projects. The focus here is on short iterations and close coordination with the customer. The introduction of agile principles should be based on this observation. Agile principles will continue to spread differently in different industries. But whoever thinks of agility about method or technology is wrong! Early results in the project and close coordination with the real customer are not method or tool results.

Agile project management does not work without appropriate governance

Agile work or delivery is only possible if necessary decisions can always be called up. In my article “Communication Principles in a Project” it is easy to see that the short time until a decision is made is extremely important. This is often slowed down or even blocked by the middle layers of management in a company. This so-called permafrost cannot comprehend the need for agility often sensibly identified by top management. Likewise, decisions necessary in the course of the project cannot be made by the senior management themselves, as are not be placed correctly with them.

Agile project management is very similar to the approach of classic projects in turnaround situations

In both cases, the focus is on short iterations and close coordination with the customer. The introduction of agile principles should be based on this observation. The classic project plan is then usually only a reference for contract-relevant delivery items. The chain of failure in projects is the customer relationship and thus the governance structure, then the tools and processes and at the latest the employee frustration. When introducing agile principles, the sequence is exactly the other way around. In my experience, the team atmosphere in project organizations can indicate a wide variety of problems at any time, and not only that “something” is wrong, but also in which project management domains (see my article SmileyPoints). It would also be interesting to use this method when introducing agile project management.

How will the agile vortex spread now?

As can be deduced from my article “Project Manager in 2030“, the agile principles will continue to spread differently in different industries. What this “agility” will look like, whether pure SCRUM, SRUM of SRCUM, Kanban, scaled agile, SAFe, LeSS, Spotify will be shaped by the customer and company environment (i.e. products, services, industry, size, etc.). Is “classic project management” dead? Certainly not, because there are certain complex (very large programs) and complicated (repetitive projects) for which classical project management will be the better alternative. Nevertheless, it makes sense for the classic project manager to make tool picking out of the agile box. But whoever associates agility with method or technology is wrong! Early results in the project and close coordination with the real customer are not method or tool results. Concepts and planning are required in both approaches. Approaches such as scaled agile approaches e.g. SAFe take this aspect particularly into account.

The challenges for product owners or project managers

The challenge for the drivers of ventures, whether product owner, project manager or program manager, will now be that they should play different instruments in different environments. Because the dogmatic orientation “we only do agile single projects” can only take place in companies that have no need for diverse interfaces and environments. The exclusive product owner or program manager will therefore rather remain the rare species. A stigmatization of the two approaches is therefore certainly not meaningful, but the combined application or simply said the agile classical project is the future. Early and constant results and close end customer coordination are the success factor in all projects.

Project planning software – everything just crap?!

2 min.

Summary:
Using a project planning and control software only as a visual representation of the planning status is a waste of time. A few tips have to be followed and MS Project and Co are also very useful for project monitoring and control.

I often hear from prospective project managers, but also from experienced project managers, that a project management tool such as MS Project is not practicable. It is too complicated and the actual control is not really possible.

If you consider the following tips nothing will go wrong anymore:

  • Set in the options that MS Project or the tool of your choice will base the planning on “fixed work”.
  • The availability (hourly capacity and holidays) of resources/qualifications must be entered in the project calendar.
  • Do not set a manual date (fixed date), except project start or finish date.
  • For each task / work package, a predecessor (at least the project start milestone) and successor (at least the project end milestone) must be entered.
  • Do not enter a duration, only the effort for the task / work package.
  • Only one resource/qualification should be entered for each activity.
  • Always display the critical path in the schedule (Gantt). This must be displayed throughout the entire project duration without interruption. Otherwise there is an error, e.g. manual date set.
  • Only plan detailed for a maximum of 2-3 months in advance (resources and effort).

And the last obstacle is again and again that your company does not invest an MS Project license for you. Then get ProjectLibre as Opensource or another freeware.

Communication Principles in a Project

3 min.

Summary

The first hours or at least days within a project do shape most of the ongoing communication in a project or program. In other words: if you do not or too late define communication principles in a project you will need to cope with issues in a later stage.

All soft topics like usage of mobile phones or laptops during meetings, respect between each other, listening to colleagues, confirm understanding, participation by all in meetings, avoid mails but call instead, and so on and so forth are topics which are often more easy to follow than the individual behavior in following topics. Therefore guidance should be given.

A set of my standard communication set up in projects from day 1 onwards as an example below.

Useful communication principles

I would like to ask you to follow these communication principles:

To minimize our mail traffic and an easier organization of our mailboxes we should agree on the following rules:

  • Only send mails towards the team members who need the information!
  • Sounds funny, meant is: avoid big distribution list without need! (same with copy!)
  • As long as we are working on drafts or on finalization of templates the drafts are only send around the nominated team
  • Often big copy distribution lists in mails are used for escalation just to be sure in case this could be needed: Please contact and inform the Program Manager respectively the needed team member before. The Stream Leads are asked to design a workaround for internal escalation handling in their streams.
  • We agree that the work of all of us is very important for this program! For that reason only mails with a critical timeline are marked as urgent.
  • Mails with a critical impact for the program content have to be marked with URG at the beginning of the subject.
  • To avoid overload the capacity of our mail server we send links where ever it is possible
  • Last but not least: Don’t bury the needed information’s in mail chains …

Mail naming convention

  1. All Mails have to be marked with the kind of information is given with the e-mail
  • INF: Information; an information is given to the addressees, no action required
  • ACT: Date, Action; and action is required by the addressee
  • DEL: Delivery; a required action is delivered
  • URG: urgent information’s start with this prefix
    e. g. URG: DREAM: SP01: … – see also file naming convention
  1. Mail subjects needs to include a short and clear description of the content
  2. Addressees on copy have in general no action !
  3. Escalations
    In general the escalations come up as followed:
  1. Team Members to Subproject Managers
  2. Subproject Managers to Project Management
  3. Project Management to Program Sponsor / SteercoE.G.: INF: DREAM: SP01: Mail Convention

Document naming convention

All documents in the program are named as followed:

  1. Date (yyyymmdd)
  2. Project Name (DREAM) and sub project number (e. g. SP01)
  3. Document name
  4. Version (drafts V 0.1 ff; finalized versions V 1.0 ff)

E.g.: 20170220_DREAM_WP01_name convention_V 0-1.doc

The four elements are separated by an underscore.

All documents which have been reviewed follow this naming convention:

  1. <Name of Original Document>
  2. Rev<Initials of Reviewer>
  3. Date (yyyymmdd)

z. B.: 20170220_DREAM_WP01_name convention_V 0-1_RevMW_20170307.doc

Meeting Agenda

3 min.Effective meetings are always a challenge. There are many guidelines and checklist available for meetings. But up to now I have not found a good template for an effective meeting agenda. In my daily usage I identified the need for two different agenda formats depending on the length of the meeting or better the number of agenda topics. Having a telco I always use following simple format (in case not many topics need to be covered) since years: INITIAL SITUATION/AUSGANGSSITUATION
  • Project status needs to be reported to steerco until Friday 12:00 CET
PREPARATION NEEDED / ERFORDERLICHE VORBEREITUNGEN (including owner)
  • Please update your work packages until Thursday 10:00 CET Server Link (ALL)
  • Please update action items status / resolution Server Link (ALL)
  • Update reporting template (ML)
AGENDA
  • Review interface issues between work packages (MW)
  • Align on action items across work packages (MW)
  • Align on Team Discussions items on project server (ML)
  • Issues and risks to be aligned on (ML)
RESULTS EXPECTED OF THE MEETING/ ERWARTETE ERGEBNISSE DES MEETINGS
  • Aligned view on the project status
NEXT STEPS AFTER THE MEETING/ NÄCHSTE SCHRITTE IM NACHGANG ZUM MEETING
  • Report to be consolidated (ML)
  • Report to be reviewed and send to steerco (MW)
  For face2face workshops or long lasting telcos I prefer using following format also for many years:
Berlin, Hauptstr. 14-16, 1.OG, Room E1.15a, Monday 05. Feb 2018 – CMO FMO Big Picture Goal: Common understanding of CMO and FMO Big Pictures and related activities Approach: Time Boxing Preparation: Presentation: Link on Server Materials: 2 beamers, moderation suitcase
Time (CET) Topic Host Input and preparation needed / Owner Result expected / Owner  Attendees 
09:30 – 10:00 Introduction and target of meeting MW  Introduction – no preparation needed  All  All
10:00 – 10:30 CMO Picture Overall  LI  Slide deck / LI Common understanding of the CMO  All
10:30 – 10:45 Break        All
10:45 – 12:45 CMO / FMO INM  LI Understanding CMO slide deck on specific process / LI Black Board FMO Picture / CS LI, CS, MA, UA and UA
12:45 – 13:30 Lunch break in restaurant        All
13:30 – 14:15 CMO / FMO PRM  LI Understanding CMO slide deck on specific process / LI Black Board FMO Picture / CS LI, CS, MA, UA and AB
14:15 – 15:00 CMO / FMO CHM  LI Understanding CMO slide deck on specific process / LI Black Board FMO Picture / CS LI, CS, MA, UA and SE
15:00 – 15:30  CMO / FMO CFM  LI Understanding CMO slide deck on specific process / LI Black Board FMO Picture / CS LI, CS, MA, UA and ME
15:30 – 15:45 Coffee Break       All
15:45 – 16:15 CMO / FMO CPM  LI  Understanding CMO slide deck on specific process / LI Black Board FMO Picture / CS KE, CS, MA, UA and KL
 16:15 – 17:00 Wrap up and next steps  MW   Action item log updated. / MW Work package descriptions amended. / work package owners Steering Board Decision preparation / LI  All
 

Building the agenda with AI

These days I no longer prepare an agenda from the template alone. I let an AI skill develop it in a short dialogue. It asks for the occasion, the objective, the participants, the duration and the format, points out the usual planning mistakes (too many topics for the time available, missing decision makers, a group too large for a working format) and ends with a one-page management version plus the detailed agenda with timeboxes. For hybrid formats it explicitly asks how remote participants will be involved on equal terms.

The skill is openly available on GitHub: github.com/MarcWidmann/acamo-pm-skills

How to use it: open SKILL.md, copy the text below the block framed by the three dashes and paste it into ChatGPT, Claude, Gemini or Copilot as your first prompt. Then answer the questions. If you work with Claude Code, you can install the repository directly as a skill. The instructions are written in German; ask the assistant to run the dialogue in English if you prefer.

Project Manager in the year 2030

6 min.

Summary:

Does the project manager still exist in 2030 – as we know him today? The answer in a nutshell: No. The tasks of the project managers will change in the areas of leadership, organization and project implementation.

I was tempted to take part in the German Projektmagazin’s blog parade. Because on the one hand we are talking here about a term “project manager” that has come under intense discussion (especially in the German speaking project manager community using terms project managers and project leaders slightly differentiated) and on the other hand about a period of time that is very long even for futurologists. The researchers do not believe to be capable to define changes in this time dimension.

The project manager as a term

Both parts of the word project manager are currently in great discussion as to whether they are meaningful or even contemporary. Projects as such like in BI unit of Otto are no longer seen as necessary. The (project) leader or project manager is not intended in the pure agile set. Here, leadership will be given an even more important focus than it already is today. Managers in the sense of controlling and directing will become less and less relevant due to the already visible developments.

It is problematic to give a future statement about the project manager in 2030, if already today the term as such no longer has the anchoring, as perhaps in the preceding decades. Let us dare an attempt.

Time as a yardstick

It’s 12 years till 2030. Appears long. If you think about what the world looked like 12 years ago, backwards from today 2018: There was no iPhone, no Android, no app stores, no Youtube, no Spotify, no Kindle, no Tablet, no digital full format sensor in a serial camera (to put my hobby into context). One recognizes it happens more in 10 or 12 years than one assumes. That’s why futurologists don’t calculate in years, but in weeks in order to emphasize the short-term nature and to evaluate future models and statements faster and make them more comparable. The futurologist assumes 50 weeks per year. How many weeks have passed since New Year’s Eve? Three. So less than 50 weeks to New Year. In these three weeks not many things happened according to the human feeling. In the best case, you have planned three weeks and reflected them three times. But the “cross-week” tactical themes don’t seem significant. Nevertheless, project managers, Scrum Masters or one-man companies are working on the revolutionary aspects of the future. In the next 597 weeks until the year 2030.

What will the project environment look like in 500 weeks?

What will the world look like in 500 weeks? It seems pretty certain that in 500 weeks I and 70% of the German population will no longer own a car. In 500 weeks we won’t have any smartphones anymore. In 500 weeks we will no longer be using a supermarket. In 500 weeks we will produce more electricity in our households than we consume. In 500 weeks we will eat meat bred in laboratories. In 500 weeks we will receive ears for people from the 3D printer as medical spare parts. In 500 weeks robots will support the care of elderly people. In 500 weeks, 40% of the German population will have intelligent non-medical implants. In 500 weeks …

All these endeavors – let’s call them projects here for simplicity’s sake – are accompanied by people. This is not about generating ideas, but about implementing them. The fact that the creation, definition and implementation of ideas should be close to each other in terms of personnel is supported by some and criticized by others.

Requirements for today’s project managers in 2030

What impact does this have on me and all the other project managers from 2018? The visionary project manager who drives this one idea will no longer exist. We can already see today how complex the world of work and the world as such has become. This can no longer be united by one person. So it will have to be more and more a team effort. Which is good. This naturally has an effect on the aspect of leadership. We recognize trends already in agile beginnings which do not represent however yet the end of the road. The following generations have and demand a different attitude to work. I have experienced this many times myself and already talk like my grandfathers (“The young people today”). But also this change is good, because …

“No change, no development.”
Birgit Ramlow (*1948), employee and hobby aphorist

Transformation vs. Revolution

And now a much criticized term from the business economics: Transformation. When I think in weeks and design endeavors in a manageable time frame, there are transformation aspects. It is revolutionary when we experience a complete technological or paradigm shift. The smartphone was not a revolution, but a courageous and creative combination of available technologies. The push came somewhat delayed by the apps. But even these are not a classic revolution, but a further development on another platform and therefore used by more users. Why was the smartphone ultimately perceived as revolutionary and has this outward appearance? Well, my thesis is that managers of competitors like Nokia and Siemens weren’t brave enough and didn’t listen to the market. Imagination and creativity were not lacking. Because carmakers are also being predicted the whole development today and the reactions to it are, in my opinion, too hesitant. In development periods of 4 years per real model change, i.e. 200 weeks, you can no longer act today. So what can we deduce from this for the project manager?

He will work a lot in transformation projects and will contribute to the revolution by quickly placing new projects with courageous and fast acting managers.

Company management or committees in 2030

The biggest changes will certainly be one level higher in the hierarchy (if you want to talk about it at all – today at least one level higher) required at the portfolio board, at the product owners or however a company implements strategic decision making for itself. At Otto in the product area, in the agile environment by the product owner – as a representative for the management or the portfolio board in classical project management. These committees will certainly have to meet the defined requirements even more than in my article, written in 2016, in order to enable the timing between the transformations to revolutions. And let’s be honest, in the ~ 60 weeks since this article was written, the claim is still not fulfilled. So there is a need for action.

Different demands on the project managers

Will the development depend on the type of project?

There will no longer be a project manager who can manage projects universally in all industries and project types. At least today’s challenging attitude will be less and less correct.

In the area of software development, agile approaches and hybrid mix forms will develop for large programs. A design of these hybrid forms is material for another blog post.

Investment projects will continue to be similarly organized as today. And thus also the role and tasks of the project manager. Even if today’s examples, such as Berlin Airport, are not promising.

The young project manager in 2030

But what about the young project manager who will manage projects for the first time in 2030? He starts with a handicap. Because he himself, but also his IT architects and other colleagues, will not have experienced any more “journeyman years” here in Germany, since all “journeyman activities” were already relocated from the last century nearshore or offshore in the 1990s. It will no longer be so easy to start a career as a project manager, however shaped it may be. This can be observed today in environments that have changed for some time, such as the textile industry. Here in Germany today there are often problems to find qualified seamstresses for the sample collection. For this reason, companies themselves have to relocate business-critical areas such as design and sample collection abroad. This will also be the case with the project managers of the future. In the virtual world, with the supporting technologies, it will always be easy to carry out projects here in Germany. But also the proximity to the customer is less and less important due to the virtual support technologies. This means that in 2030 it will also be possible to carry out projects completely from a remote location (including project managers) without missing customer proximity in Germany.

Steering committees and project boards – understand, shape and use

4 min.

Why does the topic of committees move us as project managers? We need clear decisions for our projects in cases where our empowerment is not sufficient. Why is it often difficult to obtain these necessary decisions promptly, clearly and precisely?

For this we have to understand that there are countless terms for one and the same … and many terms are used several times in practice.

I will come to the typical problems with the committees that result from this later.

Where can we find a solution? PMI braces role descriptions and organizational structure. So we cannot be helped here. Prince2 defines the mentioned committees in detail and harmoniously with IPMA or GPM.

DIN 69901-5 defines the project board as a “superordinate body to which the project manager reports and which is available to him as a decision-making and escalation body”.
This does not really help much.

Then let’s see how the PM3 of the GPM supports us.

What are steering committees? They can align the ship’s rudder in all directions on all seas.

These steering committees are … internal and … cross-project. Patzak/Rattay defines steering committee, steering group and project advisory boards as synonyms. The task of this committee is to analyse, observe and control the selection of projects and the interrelationships between projects.

The project board is also very well defined in the Duden … in my opinion ….. Namely as the “Committee for Economic Steering”. In contrast to the steering committee, this is not about defining the general meaning of a project, but about economic observation and influence. The project board is therefore represented at the steering wheel in the car on specified roads and can decide which direction to take at which intersections.

This committee, the steering committee, can also include external partners such as important suppliers or the end customer.

The PM3 states that there are no uniform rules in the organizations how control boards should work. It therefore differs from company to company. However, a typical responsibility can be worked out. The steering committee

  • appoints the Project Manager
  • selects projects
  • stops projects
  • initiates projects and shapes the
  • sets high level targets.

The PM3 also describes typical areas of responsibility for the project board. These are

  • project progress tracking
  • to clarify conflicts and powers between line and projects
  • accept milestones and project results
  • escalation in corporate management or portfolio management and
  • possibly, if there is no separate change board, the decision of amendments.

What do we as project and program managers have to do to be successfully supported by committees? Based on my experience I will explain the most important points.

  • we need to shape these bodies by
  • integrate necessary external partners
  • attract members to the committees who are highly placed in the hierarchy
  • demand that a spokesperson for the panel be appointed
  • escalation instances and solution durations at the respective escalation stages and also to
  • agree change management process.

What prerequisites and knowledge are required in the steering committees? According to Patzak / Rattay, they must have transparency and knowledge about the corporate strategy and knowledge about the project portfolio. Otherwise, the steering committee or portfolio board cannot act sensibly.

In order to be able to use the committees properly, we must observe a few basic rules.

Children and managers have at least one thing in common. They can only remember 3 things.

In your remarks as project manager in the project board, I therefore recommend that you address

  • the most important status information
  • a decision request and
  • a wish to cooperate

to the management.

Always pay attention to formulate these core messages concisely and precisely, because since the year 2000 until today, the attention span with us humans has fallen from 12 to 8 seconds. Thanks to the new technology and the new lifestyle.

Now I come to the typical problems that have already been announced. Experiences from my projects.

Berlin. Public project. In public projects, it is often very difficult to separate the project client and the shareholders. Especially the governance organization becomes complex. Defining the requirements in such a construct is particularly difficult, as is managing changes. A “reinstatement” – this verb sounds already governmental or public – is preprogrammed here.

South Africa. A project at an energy company with several divisions, which is to standardize central processes and IT systems. Due to the sheer size of the project, several external parties are required. In large-scale projects, the project offices are often staffed by external consulting companies to underline the challenging and neutral character.

Even as the largest contractor, it can be difficult to formulate uniform committee definitions and appointments. Agreeing on maximum solution times for escalated problems at the respective escalation levels is often an impossibility, but critical to success.

Israel. Again an energy company with several subsidiaries to harmonize their procurement organizations and processes. A further problem with the committee use is the decision fixation and above all the enforcement of decisions. In the run-up to committee meetings, pre-socialised decision alternatives and decisions are often questioned or not enforced again after the meeting has taken place. Here the cultural influence is formative and steering out. Decision making can take many times longer.

Bonn. Escalation levels are not mirrored for the client and contractor, i.e. there is a different number of hierarchy levels. Problems are inevitable.
A further problem unfortunately arises from frequent statements and implementation of “an internal project must also function without LA”. How is that supposed to work?

I would like to conclude with the typical problems here.

What 3 core messages should you take with you today?

  1. We must understand the differences between the Project Board and the Steering Committee and always recognize the two types of bodies, and
  2. actively design.
  3. Feel free to contact me for active exchange.